Questions & Answers › Getting started with us
What will the total cost of the extension be?
We can't give you a total for your extension until it has been designed for your block. There is no single price for an extension, and we don't publish a general price range for extensions. What we can promise is that you will see the full price in writing, as a fixed price, before you decide whether to build.How you get to a total priceDesign. The design service costs $3,500 including GST. Your proposal document sets out the period in which you can sign a building agreement with us, and if you do, that fee is not charged.Estimates during design. After the first draft plans, we start giving you estimates for the building work and the siteworks, so you can see whether the design is on track for your budget. If the estimate is over your budget, we look at changes to the design or scope with you and explain the trade-offs.Fixed price. Once you approve your final floor plans, we prepare your detailed fixed price.What makes up the totalYour fixed price can have up to three parts:a Project Proposal, for the new extension itselfa Site Scope Proposal, for site-specific work such as demolition, earthworks and service connectionsa Renovation Proposal, only if you also want agreed work done to your existing homeFor an attached extension, the work to join the new building to your existing house is included. That covers the structure, roofing, weatherproofing, demolition and making good, plastering, painting, and moving services where needed.We absorb the cost of getting the planning and building approvals the ACT Government requires.What can change the final amountYour choices against allowances. The price includes allowances for items such as tapware, tiles, appliances and flooring. These are set out in a Prime Cost Allowance Schedule. If you choose items that cost more than the allowance, you pay the difference. If you choose items that cost less, the price comes down.Changes you ask for after signing. These are handled as variations, and you sign off on the cost before the work starts.Items that can't be priced up front. An example is a power meter upgrade, which depends on what Evoenergy requires.Things the contract does not cover. These include digging out rock and removing asbestos. They are rare, but they are paid by the owner if they come up.Additional reports or ACT Government applications. Fewer than 20% of projects need these.Rules that can affect the cost of an extensionAn extension that fully complies with the Planning (Exempt Development) Regulation usually needs only a Building Approval. If it doesn't comply, it may also need a Development Approval.An extension with new plumbing may need a water tank or other water-saving measures under the ACT planning rules.A detached extension triggers an energy assessment of the whole house, which will require a heat pump hot water system.The quickest way to get a realistic figure for your property is to talk to us about your plans and budget. Call 1300 979 658 or email info@cgfb.com.au.QAID 978 · last reviewed 22 November 2026