Questions & Answers › Approvals and planning rules
Is there any overlap between the Development Approval (DA) and Building Approval (BA) processes? If so, how is this managed?
Yes - there is often significant overlap between the Development Approval (DA) and Building Approval (BA) processes, particularly on more complex projects.
Although DA and BA assess different aspects of a project, many design decisions affect both planning compliance and construction compliance at the same time.
For example, the following items may influence both DA and BA:
- Building height and floor levels
- Retaining walls and excavation
- Tree protection requirements
- Drainage and stormwater design
- Accessibility requirements
- Fire separation requirements
- Site constraints and easements
- Structural design and buildability
- Energy efficiency requirements
- Parking and access design
Because of this overlap, changes made during the BA process can sometimes require updates to DA-approved plans.
Example
A project may receive Development Approval based on a proposed floor level or building layout, but during Building Approval:
- Structural engineering may require changes
- Drainage design may affect levels
- NCC compliance may require additional wall thicknesses or fire separation
- Existing site conditions may require redesign
These changes can potentially affect the approved planning outcome.
How is this managed?
The best approach is to consider both DA and BA requirements early during the design phase, rather than treating them as completely separate stages.
This is typically managed through:
- Early consultant involvement
- Coordination between designers, engineers, and certifiers
- Reviewing NCC and structural requirements before DA submission
- Identifying planning and construction risks early
- Designing with both approval pathways in mind
The goal is to reduce:
- Redesign after DA
- Approval delays
- Cost increases
- Conflicts between planning and construction requirements
For more complex projects, successful outcomes usually depend on integrating planning, engineering, and construction thinking from the beginning of the design process.
QAID 1037 · last reviewed 28 May 2026
Related questions
- Can you subdivide a block with a secondary residence on it?
- What is a Letter of Authorisation?
- When is Demolition application required?
- Can a customer/property owner request a preliminary meeting with the Conservator of Flora and Fauna to ascertain if there are any special requirement's regarding trees on their property?