Are there special requirements or rules around power, water and sewage connections?
Yes. There are rules about power, water and sewer connections. Some come from ACT planning law and some come from the utility providers (Evoenergy for electricity and gas, Icon Water for water and sewer). Here are the two parts separately.
What the law says
The Planning (Residential Zones) Technical Specifications 2026 (NI2026-303) set benchmarks for development in residential zones.
Under spec 29.1, a proposed development must be able to be sufficiently serviced for infrastructure and utilities. Endorsement is to be achieved from the relevant utility providers (electricity, water, gas, sewerage and stormwater). They confirm that the earthworks, utility connections, buildings, pavements and landscape features comply with utility standards, access provisions and asset clearance zones.
Under spec 19.5, new single dwellings, Secondary Residences and extensions must meet a water saving option. The exceptions are extensions of 50% or less of the existing gross floor area, and work where no new plumbing is proposed. The options are:
Option A, a rainwater tank (or WELS-rated fixtures on compact blocks):
- Compact blocks: no minimum water storage, but at least WELS-rated plumbing fixtures.
- Mid-sized blocks: at least 2,000 litres of roof water storage, connected to 50% or 75 sqm of roof area, whichever is less.
- Large blocks up to 800 sqm: at least 4,000 litres, connected to 50% or 100 sqm of roof area, whichever is less.
- Large blocks of 800 sqm or more: at least 5,000 litres, connected to 50% or 125 sqm of roof area, whichever is less.
For the tank options, the tank must be connected to at least a toilet, laundry cold water and the external taps attached to the house.
Option B, a greywater system that captures all bathroom and laundry greywater and treats it to Class A standard. The treated water is connected to all laundry cold water, toilet flushing and all external taps.
Option C, evidence of a 40% reduction in mains water use compared with an equivalent development built in 2003, without relying on landscaping.
The water-saving rule is mandatory. The design must meet Option A, B or C.
How we handle it
Power: A Secondary Residence may need upgrades to your power supply. A studio or one-bedroom Secondary Residence is less likely to need them. A 2, 3 or 4-bedroom Secondary Residence is more likely to, because it needs more power circuits. Appliance types, heating and cooling units, and the number of power points and lights also affect this.
Separate electricity metering (dual tenancy metering) is usually possible, so each household has its own account and bill. It generally needs a second meter board and the process is set by Evoenergy. The price guide is $2,500 to $5,000 for an average project. A cheaper option is an electrical submeter at around $700. It lets you work out how much power the new building uses, but it does not give a separate account or bill.
Water: A secondary water meter is possible on most blocks, but it is rarely done. The price guide is $2,500 to $10,000. A water submeter is around $700. If you ever plan to subdivide the block, you must have independent connections to the water network. For unit titled dwellings on one lease, separate service connections are not required. Separate unit metering is required for new multi-unit developments from 1 July 2025.
Sewer: Separate sewer connections are not required for unit titles or unit titled dual occupancies. They are only required for subdivided blocks. See Advisory Note 19 on the ACT Planning website and the Icon Water guide for dual occupancy and secondary residences.
Gas: If your property already has a gas connection, we can usually use it. We may need extra investment to do this. Gas connections are not a standard inclusion.
Easements: Check your block for easements on ACTmapi. You cannot build on top of an underground easement. Building closer than 2m to one needs reinforced concrete piers. The utility owner sets its own requirements and its decisions are not reviewable.
If you are not sure which of these apply to your block, please get in touch and we will check it with you.
QAID 923 · last reviewed 23 November 2026
Related questions
- How are new connections made to a new building from an existing building? These connections include sewer, electricity, gas, water, storm water
- At what stage during the build will the power, water, gas and sewer facilities be functional?
- What is the process if we need to get our power lines that connects energy to our house moved because of the proposed development?
- When there’s a powerline shown on the proposal, is it provided to show that it can’t be built on?